County: Flagging Operation Starts Today For Barranca Road Crosswalk Project

COUNTY NEWS

Crews will be working on Barranca Road, near Camino Encantado on Tuesday, April 27 starting at 9:00 a.m. and ending by 3:00 p.m. Crews will be eradicating a crosswalk, to consolidate with an existing crosswalk near the bus stop to the east. This work was planned in coordination with the Atomic City Transit Division, as a safety measure with the existing bus stop.

A flagging operation will be in place. Pedestrian and vehicle traffic are urged to slow down and obey all traffic control devices within this work zone.

Questions related to this project should be directed to Anthony Lucero at 505-695-3671 or LACPW@lacnm.us